{"product_id":"fods-6-inch-concrete-screw-for-trackout-control-mat","title":"FODS 6\" Concrete Screw For Trackout Control Mat","description":"\u003ch2\u003e\u003cstrong\u003eProduct Features For 6\" Concrete Screw for Trackout Control Mat\u003c\/strong\u003e\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003ePrice above is for each unit\u003c\/li\u003e\n\u003cli\u003eSold as Min and Multiple of Qty 10\u003c\/li\u003e\n\u003cli\u003eDesigned for Hard Substrates including concrete, asphalt, and other rigid surfaces\u003c\/li\u003e\n\u003cli\u003ePrevents Mat Shifting caused by vehicle braking, acceleration, or turning\u003c\/li\u003e\n\u003cli\u003eHigh-Strength Steel Construction offers dependable holding power in demanding jobsite conditions\u003c\/li\u003e\n\u003cli\u003eEasy Installation using standard jobsite tools\u003c\/li\u003e\n\u003cli\u003eRecommended Tooling: Rotary hammer drill, 3\/4\" concrete drill bit, heavy-duty impact wrench, 1-1\/8\" socket\u003c\/li\u003e\n\u003cli\u003eFlush-Installation Design - tighten screw only until flush with mat surface\u003c\/li\u003e\n\u003cli\u003eAllows for Expansion \u0026amp; Contraction - does not compress mat when properly installed\u003c\/li\u003e\n\u003cli\u003e2\" Expansion Gap Requirement when installing multiple mats on hard surfaces\u003cbr\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003e\n\u003cstrong\u003e\u003cbr\u003eProduct Description For 6\" Concrete Screw For Trackout Control Mat\u003c\/strong\u003e\u003cbr\u003e\n\u003c\/h3\u003e\n\u003cp\u003eThe 6\" Concrete Screw is a purpose-built anchoring solution engineered for securing the FODS Trackout Control System on hard substrates such as concrete and asphalt. Its heavy-duty construction delivers strong, reliable holding power that prevents Trackout Control Mats from shifting under vehicle load, braking force, or acceleration, ensuring a stable and compliant trackout control setup. Each screw is designed for easy installation using common jobsite tools, including a rotary hammer drill with a 3\/4\" concrete bit and a heavy-duty impact wrench. To ensure optimal performance, the screws should be tightened only until flush with the top of the mat, preventing unnecessary compression and allowing for natural expansion and contraction. When installing on rigid surfaces, a 2\" gap between mats must be maintained to accommodate thermal movement.\u003c\/p\u003e\n\u003cp\u003eWhether for construction entrances, industrial sites, or environmental compliance locations, these 6\" concrete screws provide the secure anchoring required to keep your Trackout Control Mats in place under demanding conditions.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003ch3\u003e\u003ca rel=\"noopener\" title=\"Fods Installation Guide\" href=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0888\/6914\/2834\/files\/fods-mats-and-accessories-install-guide.pdf\" target=\"_blank\"\u003e\u003cstrong\u003eClick Here For Installation Guide\u003c\/strong\u003e\u003c\/a\u003e\u003c\/h3\u003e","brand":"FODS","offers":[{"title":"Default Title","offer_id":67678550589590,"sku":"5450","price":18.42,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0706\/6271\/7590\/files\/fods-6-inch-concrete-screw-for-trackout-control-mat.webp?v=1794335776","url":"https:\/\/groundpromats.ca\/products\/fods-6-inch-concrete-screw-for-trackout-control-mat","provider":"Ground Pro Mats Canada","version":"1.0","type":"link"}